The 15th SMART ENERGY WEEK [Osaka] runs from 24 to 26 November 2027 (Wednesday to Friday, 10:00 to 17:00) at INTEX Osaka and is organised by RX Japan; overseas companies request the exhibiting information from the organiser and sign the English exhibitor contract, and the organiser’s Japanese FAQ says there is no fixed deadline, with applications closing once the exhibition space is gone. Where you have no company in Japan, we handle the import and the filing in Japan for general electronic components that need no separate approval (electrical goods) and for parts and material samples (general goods); for storage batteries, energy storage cabinets, BMS modules, inverter modules and hydrogen equipment, who acts as importer of record where you have no company in Japan is confirmed by product category and listed in your task list. The organiser’s fee list prices raw space at JPY 1,400,000 per 16.2 sqm booth (stand), a figure that already includes the standard digital platform plan, with consumption tax on top; the platform fee itself is mandatory, with the lowest plan costing JPY 50,000. The series runs three editions a year (March in Tokyo, October at Makuhari, November in Osaka); for the spring show, see how to exhibit at SMART ENERGY WEEK Spring 2027.
Send us the list of units and components you plan to ship to Osaka and you will receive a free feasibility check and task list, or email info@terravista.co.jp. Its first page gives our recommendation for a booth in Osaka this year; the pages after it set out, unit by unit, who imports it and how it gets home.
Terra Vista Co., Ltd. is a Japanese company. We deal with the organiser, freight and customs, and book meetings with buyers in western Japan, and one project manager coordinates your whole show.
Information checked: November 2026.
Ways to take part
Can an overseas company book a booth directly?
The organiser describes four steps: request the information pack, agree the booth location and size with the organiser, submit the application, then start preparing. Which locations you can choose depends on how many booths you take.
| Book a booth (stand) | |
|---|---|
| What you arrange | Sign the English contract, which can be done by e-signature; the organiser allocates space on factors such as the order in which contracts arrive and the number of booths, and confirms your booth number separately; pay the booth fee by the due date on the organiser’s invoice; file power and demonstration applications once the exhibitor manual is out; decide how each unit returns home before it ships; from 90 days before opening we screen buyer types in the Kansai region for your products and send invitations that name the topics, aiming for 8 to 10 meetings at your stand, and the customers we invite register in advance for free, one badge covering all three days and the concurrent Sustainability Management Week [Osaka] and the Thermal Energy Expo |
| Suits | PV component, battery material and grid equipment makers whose units can stand on display and who want a distributor in western Japan, or already have one |
The organiser offers exhibitors free online consultation in English on weekdays, and runs consultation sessions in Tokyo and Osaka several times a year where staff discuss booth location and cost one company at a time.
Who you will meet
Who visits SMART ENERGY WEEK Osaka 2027, and what do they come to see?
The Osaka edition has three specialised shows: PV EXPO [Osaka], BATTERY JAPAN [Osaka] and SMART GRID EXPO [Osaka], with two special areas, H2 Power World Osaka and FUSION POWER WORLD. Describing its smart grid show, the organiser says the Tokyo editions draw visitors from eastern Japan, while the Osaka edition draws power companies, aggregators and end users from western Japan. The 2025 Osaka edition, held in Hall 6 at INTEX Osaka, had 193 exhibitors including the concurrent show, and 11,489 visits by its own and the concurrent show’s visitors, counted once per person per day and excluding exhibitors and press. The organiser forecasts 230 exhibitors and 12,000 visitors for 2027, again including the concurrent show. Buyer types come from the visitor categories the organiser publishes; what each looks for and what to prepare is our own analysis. Our SMART ENERGY WEEK Osaka show page gives the wider picture.
| Buyer type | What they look at | What to bring |
|---|---|---|
| Battery, component and materials manufacturers | Whether your material can replace what they use now, and whether you can supply in volume | Data sheets with test conditions, evaluation samples, capacity and quality records |
| Trading companies and distributors | Terms for representing you, and who holds stock and handles after-sales in Japan | Your distribution policy, a price list and a quotation in Japanese format |
| Power, gas and generation companies in western Japan | Grid connection terms for storage and power conversion equipment, maintenance and long-term supply | A Japanese specification sheet, a list of certifications and a maintenance contact in Japan |
| PV installers, house builders and builders’ merchants | How modules, mounting and building-integrated PV install on site, and lead times | Installation notes, physical samples and a quotation stating delivery terms |
| Factories, building owners and local governments | Savings from on-site PV, storage and energy management | A savings and payback estimate and a one-page outline of the installation process |
How we read the Osaka edition
On the organiser’s 2025 Osaka chart for PV EXPO, which covers that show alone (PV EXPO exhibitor page, Japanese), parts and materials have about a 13.0% visitor share and trading firms and distributors about 10.1%; power and generation companies have about an 8.4% visitor share and PV installers about 8.1%. Our view: adding the visitor shares, we get 23.1% (13.0% plus 10.1%) for parts, materials and trading firms; adding the visitor shares of generators and installers (8.4% plus 8.1%) gives a 16.5% visitor share. Suppliers of components and materials, and companies looking for a distributor, therefore have the better odds of meeting the right people in the Osaka PV hall. The Kinki Bureau of Economy, Trade and Industry describes the Kansai area as a cluster of battery-related industry (on its Kansai battery consortium page; the bureau’s Kinki region also covers Fukui Prefecture), so battery and materials suppliers can look first at who exhibits and visits in the battery and materials halls before deciding on a booth. We recommend a booth, and three points shape the plan:
- your exhibits are PV components, batteries and materials, grid equipment or hydrogen equipment that can be displayed or run as the manual describes;
- you can answer questions on specifications, certification and delivery terms with documents in Japanese;
- someone in Japan can follow up sample evaluations and return visits with western Japan customers after your team flies home.
If one is missing, settle it while the stand is planned: have a Japanese specification sheet in hand and name who follows up in Japan, and we book Kansai battery makers and distributors to meet you at the stand.
Published by the organiser
SMART ENERGY WEEK Osaka 2027: dates, space prices and the organiser’s rules
| Item | Published by the organiser | Source |
|---|---|---|
| Dates and venue | 24 to 26 November 2027 (Wednesday to Friday), 10:00 to 17:00; INTEX Osaka; 15th edition | About the show, exhibitor contract |
| Shows and areas | PV EXPO [Osaka] (15th), BATTERY JAPAN [Osaka] (14th), SMART GRID EXPO [Osaka] (14th); special areas H2 Power World Osaka and FUSION POWER WORLD; concurrent with the 7th Sustainability Management Week [Osaka] | About the show |
| How to apply | Submit the exhibiting information request or contact Show Management; the information offered includes the show brochure, a cost estimation and an updated floor plan | Exhibiting page |
| Deadline and allocation | The Japanese FAQ: no fixed deadline, applications close when the exhibition space is gone; space is allocated on factors such as contract order and number of booths, and the organiser may change the floor layout and reassign space; the organiser decides whether an exhibit suits the show | Exhibiting FAQ (Japanese), exhibitor contract |
| Space price | Fee list shared by the 2027 spring, autumn and Osaka shows, with Osaka in the same column as the Tokyo autumn show: raw space 6.0m × 2.7m = 16.2 sqm, JPY 1,400,000; 24.3 sqm, JPY 2,025,000; 32.4 sqm, JPY 2,650,000; each including the standard platform plan, with 10% consumption tax on top; a note adds JPY 50,000 for raw space in some locations | Participation fee list |
| Mandatory platform fee | The digital platform plan must be applied for; the contract lists three plans, the lowest at JPY 50,000, plus JPY 50,000 if you have co-exhibitors; the organiser’s shared fee list is priced on the JPY 150,000 plan; all before consumption tax | Exhibitor contract, fee list |
| Paying the organiser | Booth fees are paid by the due date on the organiser’s invoice | Exhibitor contract |
| Invitation letters | Issued only to exhibitors who have paid their fees in full | Exhibitor page |
| Last edition | 2025 Osaka edition (INTEX Osaka Hall 6): 193 exhibitors and 11,489 visits, both including the concurrent show; visits counted per day, excluding exhibitors and press | 2025 show report, visitor count page |
Cost structure
What adds up to the cost of exhibiting in Osaka?
Your total depends on our stand design and the services you choose, so each company gets its own tailored proposal and quotation. The table sorts the spending by who you pay.
| Paid to the organiser and the venue | Paid to third parties | Optional work with us |
|---|---|---|
| Raw space, the mandatory platform fee and consumption tax (see above) | Freight to Osaka and back; for units with lithium batteries, confirm the shipping conditions with your forwarder and carrier | Registration and the contract |
| Main power supply, electricity and network, applied for through the exhibitor manual | Cargo and travel insurance | Stand design, build and dismantling |
| Paid options such as exhibitor presentations and advertising | Flights and hotels in Osaka | Freight, import and the return of your units |
| Buyer invitations, Japanese documents, interpreters and follow-up |
Under the 2026 Osaka exhibitor manual the stand, including decoration, may be up to 3.6 metres high, and sound must stay under 75 decibels at 1.5 metres from the booth; see exhibition stand design and build. The booth fee is listed separately at the organiser’s published price, and our services are quoted separately. Payment follows the contract, normally an advance payment and a balance; booth fees are priced in Japanese yen, and when you work through us, US dollars, euros and other currencies can be arranged.
Exhibits and samples
Batteries, storage and hydrogen at SMART ENERGY WEEK Osaka 2027: fire rules and customs
For each unit, settle who brings it into Japan, whether it will be powered or run on hydrogen at INTEX Osaka, and how it leaves Japan. The fire section of the organiser’s 2026 Osaka exhibitor manual covers three categories: use of fire, dangerous materials and hydrogen. Move-in times and filing deadlines for 2027 go into your task list once the new manual is published.
| Situation | What is required | Official basis |
|---|---|---|
| Lithium-ion batteries and cells on display | The METI FAQ says electrical products without the PSE mark and the notifier’s name may not be sold or displayed for sale; batteries imported on a trial basis, not for sale, still need an import business notification, but conformity to the technical standards is not required, with new product development and product testing for in-house use given as examples; a battery fitted in a device is treated as an import of that device | METI lithium-ion battery FAQ (Japanese) |
| Hydrogen demonstrations and hydrogen storage alloy | Carrying in hydrogen and demonstrating with it are prohibited in principle and permitted only where the fire regulations are met; carrying in hydrogen storage alloy also needs an application; apply through the organiser’s official contractor, in Japanese only, by a deadline the manual says is earlier than in past years; bring only the minimum amount for each day, with no refilling during the show; keep a fire extinguisher and a safety officer on the booth throughout, move-in included; only products approved in Japan may be demonstrated, and fire officials grant permission on site during move-in | 2026 Osaka exhibitor manual |
| Use of fire and dangerous materials | Prohibited in the halls without special permission from the fire department, with all applications filed by the organiser; designated flammable goods fall under the Osaka City Fire Prevention Ordinance; applications need a layout, equipment catalogue, demonstration schedule, heat calculation and safety data sheet (SDS) | 2026 Osaka exhibitor manual |
| Units bringing their own Wi-Fi or Bluetooth | Radio equipment normally needs Japan’s technical conformity mark (giteki); without it, short-term experiments, tests and surveys of up to 180 days can use the equipment after an advance notification | Ministry of Internal Affairs and Communications |
| Return home with an ATA Carnet | Japan Customs lists 81 countries and territories whose carnets can be used (as at 15 July 2024), including India, Indonesia, Korea, Malaysia, the Philippines, Singapore, Thailand, Vietnam, the United Kingdom and the United States; the carnet is valid for up to one year from issue, and you present it to Customs at import and again at export, within its validity | Japan Customs carnet list (Japanese), Japan Customs temporary admission |
| Return home without a carnet | Goods for exhibitions can be exempted from duty under Article 17 of the Customs Tariff Law when re-exported; the importer submits the stated document at import and export, and Customs may ask for security for the duty | Japan Customs temporary admission |
Where you have no company in Japan, we handle the import and the filing in Japan for general electronic components that need no separate approval (electrical goods) and for parts and material samples (general goods). For storage batteries, energy storage cabinets, BMS modules, inverter modules and hydrogen equipment, who acts as importer of record where you have no company in Japan is confirmed by product category and listed in your task list. Our task list sets out the conditions of each way of bringing units home; once you choose one, we arrange the freight and customs to match. If you plan to sell powered products in Japan after the show, see PSE certification support.
Timeline
Working back from 24 November 2027, which dates matter?
Rows marked “2026 practice” follow last year’s Osaka exhibitor manual and exhibitor page.
| Milestone | What happens |
|---|---|
| After the contract | The organiser invoices you; pay by the due date, then request the invitation letter if your staff need visas |
| 90 days before opening (our outreach starts) | We shortlist buyer types in the Kansai region and send meeting invitations that name the topics |
| About 3.5 months before | The organiser sends the exhibitor website details; your booth number appears there |
| Once the exhibitor manual is out | File the main power supply, fire and dangerous materials applications; hydrogen goes through the official contractor, in Japanese |
| Before travel | Where a visa is needed, the inviting organisation in Japan sends its documents to your staff, who then apply at the Japanese embassy or consulate |
| One month before | Vehicle passes become available on the exhibitor website |
| Two days and one day before opening (2026 practice) | Move-in and build; vehicles may not enter after 13:00 on the second day, and power comes on at noon that day |
| 24 to 26 November 2027 | Show days, 10:00 to 17:00; exhibitors may enter from 8:40 (2026 practice) |
| Last day after 17:00 (2026 practice) | Hand-carry exhibits out from 17:00, dismantle from 18:00 until 22:00 |
Points to settle before you commit
- Visas: Japan has visa exemption arrangements with 74 countries and regions, and conditions vary by country, so check your own country’s entry before you travel (MOFA visa exemption list); nationals of countries outside the list, such as India, the Philippines and Vietnam, need a visa, for which the inviting organisation in Japan prepares a letter of reason for invitation and a schedule of stay. Short-term stay does not cover paid work.
- Return route: choose the carnet or the re-export route before the units ship, because the paperwork begins at import.
- Hydrogen demonstrations: start the Japanese documents as soon as the manual is published.
Where does this show sit in your year?
In our example roadmap for an energy equipment maker entering Japan, SMART ENERGY WEEK Osaka 2027 is a connect stop and the last stop of the year: a Standard Booth, with Kansai battery makers, distributors, power companies and PV installers booked to meet you there before the show. The organiser says the Osaka edition draws power companies, aggregators and end users from western Japan, so this is where the stop before, SMART ENERGY WEEK Autumn on 6 to 8 October at Makuhari Messe, hands over its installation and evaluation questions, which you answer with operation, maintenance and handover documents. The order changes with your equipment and the customers you are after.
See the SMART ENERGY WEEK Osaka Show Brief → Get a roadmap for your products →
Our services
Our services for SMART ENERGY WEEK Osaka 2027: getting units to Osaka and meeting western Japan buyers
Most overseas exhibitors come to Osaka to meet battery makers, utilities, installers and distributors they will not see in Tokyo, while their team is based outside Japan. Each item below can be booked on its own.
Contract, stand and units
- Registration: the booth fee follows the organiser’s published rate and venue charges are listed separately, see overseas exhibition costs.
- Stand design and build: we design, produce, install and dismantle the stand for the space you have booked, see exhibition stand design and build.
- Shipping and customs: freight, customs, certification checks, documents and travel go on one task sheet that names who does what by when, worked back from the official forwarder’s deadline, see exhibit logistics and customs.
- Importer of record for electrical goods and general goods samples, see importer of record service.
Meetings in Japanese
- Buyer invitations: we screen buyer types for your products, send invitations that name the topics and confirm the time, place and agenda of each meeting, see pre-show buyer outreach. At your stand, buyer meetings are booked before the show.
- Japanese documents: a one-page sheet and a specification sheet in Japanese naming your Japan-side contact, and a price list in Japanese format showing tax, lead time, minimum order and landed cost, see Japan trade show support.
- Interpreters: staff matched to the buyers’ languages, with rehearsals before the show, shift rotas and meeting notes written up each evening, see on-site staff and interpreters.
- A briefing for distributors in Osaka on your product, supply capacity and plans for entering the market, see seminars and briefings.
After your team flies home
- Eight weeks of follow-up in Japanese, with each buyer’s next step recorded, see Japan trade show support.
- Business visits in Kansai, with meetings booked and interpreters arranged, see business visits.
- First order: the compliance route, the importer of record, the Japanese label and quotation, through to delivery, see Japan market access support.
On site at INTEX Osaka
- Exhibitor badges are registered in advance; without one your staff cannot enter during the three show days, though none is needed for move-in and move-out (2026 practice).
- Bring large units in on the first move-in day; after 13:00 on the second day only hand-carried items go in (2026 practice).
- The hydrogen safety officer stays on the booth from move-in; for fire use, the person in charge of the stand must be present during the fire inspection (2026 practice).
- Leaflets and samples go out only inside your booth (the organiser’s FAQ).
- In 2026 a direct shuttle bus ran from Osaka (Umeda) Station to the venue in about 35 minutes; the nearest station, Nakafuto, is about a five-minute walk.
- At the 2026 Osaka edition the organiser listed a Korean companies’ pavilion; whether your own country sends a group can be checked with the organiser’s sales contact.
Free task list
What will the free feasibility check and task list tell you?
The first page gives our recommendation for a booth in Osaka this year, with three reasons. The pages that follow work back from the organiser’s dates, the fire filings and customs to a list of tasks for each unit, and end with the questions still to put to the organiser. You receive it in about 5 business days.
| Sample excerpt: milestone | Published rule | Basis |
|---|---|---|
| Choosing a location | Locations available depend on the number of booths | Exhibiting FAQ |
| After full payment | Invitation letters can be requested | Exhibitor page |
| Once the manual is out | Hydrogen applications go through the official contractor, in Japanese | 2026 Osaka exhibitor manual |
| 24 to 26 November 2027 | Leaflets and samples are handed out inside the booth only | Exhibiting FAQ |
The excerpt shows published rules only; the full list also names who is responsible for each task. To request it, send the show name and your list of units; booth size is optional. The list is free, and whether to work with us is your decision once you have read it. Everything you share is kept confidential from the first conversation.
Send the show name and your list of battery and storage units to receive your feasibility check and task list
WhatsApp: scan to message our English-speaking team with the show name and your exhibits.FAQ
Six questions overseas exhibitors ask about the Osaka edition
Can we exhibit without a company in Japan, and how do our units get in?
Overseas companies sign the English contract for SMART ENERGY WEEK Osaka 2027 with the organiser, and Japan Customs exempts goods for exhibitions from duty when they are re-exported within the permitted period, with or without an ATA Carnet. We handle the import and the filing in Japan for general electronic components that need no separate approval (electrical goods) and for parts and material samples (general goods); for storage batteries, energy storage cabinets, BMS modules, inverter modules and hydrogen equipment, who acts as importer of record where you have no company in Japan is confirmed by product category and listed in your task list.
How much does booth space cost at the Osaka edition?
The organiser’s fee list for SMART ENERGY WEEK Osaka 2027 shows raw space at JPY 1,400,000 per 16.2 sqm booth, including the standard platform plan, with 10% consumption tax on top and a note of JPY 50,000 more for some locations; the platform fee is mandatory and the lowest plan costs JPY 50,000. Stand build, power, freight and travel come on top, and our services are quoted on your stand design and the items you choose.
Who visits the Osaka edition?
The organiser says SMART ENERGY WEEK Osaka draws power companies, aggregators and end users from western Japan to its smart grid show; on the 2025 Osaka chart for PV EXPO alone, parts and materials had about a 13.0% visitor share and trading firms and distributors about 10.1%.
Do our staff need a visa?
It depends on nationality: Japan exempts visitors from 74 countries and regions for short stays, with conditions that vary by country, while others, such as India, the Philippines and Vietnam, need a visa supported by documents from an inviting organisation in Japan; for SMART ENERGY WEEK Osaka 2027 the organiser issues invitation letters only to exhibitors who have paid in full.
Can we use an ATA Carnet issued in our own country?
If your country is on Japan Customs’ list of 81 countries and territories (as at 15 July 2024), yes: the carnet covers goods for use at exhibitions such as SMART ENERGY WEEK Osaka 2027, is valid for up to one year from issue, and is presented to Customs at import and again at export, within its validity.
What is needed to demonstrate hydrogen equipment at INTEX Osaka?
Under the 2026 SMART ENERGY WEEK Osaka exhibitor manual, hydrogen demonstrations are prohibited in principle and permitted only where the fire regulations are met: you apply through the official contractor with Japanese documents only, before an earlier deadline than in past years, bring only each day’s minimum amount, and may demonstrate only products approved in Japan.