Overseas Factory Evaluation Table is a company method used by Terra Vista Co., Ltd. to compare OEM factories. Five weighted criteria support decisions at prototype, small-batch and mass-production stages, with a separate threshold for each stage.
The five criteria are quality systems, capacity and lead times, cost transparency, compliance and audit cooperation, and communication. Procurement teams can discuss how to apply the table to their process through our contact page.
- Use the same five criteria at each stage, but apply the relevant stage threshold and conditions. The weights and thresholds are company method settings.
- The score considers willingness to disclose cost components, not just the quoted total.
- This method makes audit evidence a condition before moving to mass production, rather than leaving audits until a problem occurs.
The table brings weighted criteria and stage-specific thresholds into a documented factory comparison. Its scores are a company decision tool, not an industry certification or a prediction of performance.
What should we assess when comparing overseas factories?
Score the five criteria: quality systems, capacity and lead times, cost transparency, compliance and audit cooperation, and communication. Read the total together with the required conditions at each stage.
Define what to check on site and which documents to request for each criterion in advance.
| Criterion | Weight | What to check on site | Documents to request |
|---|---|---|---|
| Quality systems | 25 | 5S practices and incoming, in-process and outgoing inspection arrangements | Quality manual, recent-lot inspection records and copies of certificates |
| Capacity and lead times | 20 | Utilisation, peak-season priorities and spare capacity at bottleneck processes | Monthly capacity, on-time delivery records and major equipment list |
| Cost transparency | 20 | Willingness to break down the quote and the rules for requoting when material costs change | A quotation separating materials, processing and overheads |
| Compliance and audit cooperation | 20 | Previous access for audits and the history of corrective actions | Audit reports, corrective-action records and subcontractor list |
| Communication | 15 | Accuracy and speed of answers, and the contact route for specification changes | Standard communication flow and records of previous exchanges |
The weights total 100. A criterion with no supporting documents receives zero under this method.
Should prototype, small-batch and mass-production thresholds differ?
Yes. This table uses 60 for prototypes,70 for small batches and 80 for mass production, with additional required conditions at each stage. These are company method settings.
The total required rises by stage. Audit evidence is a required condition immediately before the move to mass production.
| Stage | Total-score threshold | Additional condition at this stage | What to verify |
|---|---|---|---|
| Prototype | At least 60 | Quality systems score of at least 15 | Prototype samples and inspection records |
| Small batch | At least 70 | Capacity and lead-times score of at least 14 | Additional in-process inspection records |
| Mass production | At least 80 | Audit evidence under the audit-cooperation criterion | An on-site audit before the transition |
How can we assess a factory we cannot visit ourselves?
Begin with documentary assessment. In particular, assess the compliance and audit criterion using the available independent audit report. Check its site, date and scope against the intended process; the table’s pre-mass-production audit condition remains.
Request five document groups first: quality manual and inspection records; monthly capacity and delivery records; a cost breakdown; an independent audit report; and a communication flow. A criterion without documents scores zero.
Should we choose the factory with the lowest quoted total?
No. This table scores disclosure of the cost structure rather than awarding points simply for a low total.
A factory that does not provide a breakdown scores lower on this criterion. The same criterion checks whether requoting rules for material-price changes are clear.
Seven steps for applying the table
- Choose one process and one target country, then shortlist three to five factories.
- Collect documents for the five criteria from each candidate.
- Have at least two people score independently and compare evidence where scores differ substantially.
- Check the prototype threshold and conditions; place candidates that do not meet them behind those that do.
- During the small batch, obtain in-process inspection records and rescore capacity and lead times.
- Complete the pre-mass-production audit and settle the compliance and audit-cooperation assessment.
- After mass production starts, rescore quarterly and request corrective action where a criterion falls below its required level.
Fictional calculation: choosing a Vietnamese OEM for stainless-steel cookware
All factory names and numbers are fictional. The three candidates are scored on five criteria, then compared with the stage thresholds and conditions.
| Candidate | Quality systems | Capacity and lead times | Cost transparency | Compliance and audit cooperation | Communication | Total | Assessment |
|---|---|---|---|---|---|---|---|
| X: lowest total quote | 18 | 14 | 8 | 10 | 9 | 59 | Below the prototype threshold |
| Y: promptly provides cost breakdown and audit records | 20 | 16 | 17 | 15 | 12 | 80 | Reaches the mass-production threshold |
| Z: low priority during peak season | 22 | 12 | 18 | 16 | 10 | 78 | Reaches the prototype stage only |
X has the lowest quote but weak cost disclosure and falls below the prototype threshold. In this fictional example, Y has the required audit evidence and reaches the mass-production stage. Z scores below 14 for capacity and lead times, so remains at the prototype stage despite a total of 78.
Comparing two factory-selection approaches
| Aspect | An alternative approach | Overseas Factory Evaluation Table |
|---|---|---|
| Shortlisting | Order candidates by quoted total | Use total scores together with required conditions |
| Cost comparison | Compare totals only | Score cost disclosure |
| Moving to mass production | Judge from the prototype’s appearance | Apply the thresholds and conditions for each stage |
| Audit timing | Audit after a problem occurs | Require an audit before the transition |
| When a visit is not possible | Rely on another customer’s reputation report | Start with documentary assessment and check audit evidence |
For a one-off, short-lead-time prototype, a simpler comparison may be useful; choose its scope around the actual process and requirements.
Primary sources on contracts and audits
The weights and thresholds are company settings. The sources below inform contract questions and examples of on-site assessment.
| Subject | Primary source | Date | Use in the table |
|---|---|---|---|
| Example inspection and audit clauses in a China manufacturing contract; the structure can inform questions for other markets | JETRO: how to commission production from a Chinese company | August 2025 | Reviewing audit provisions in a contract |
| Example of local assessment | JETRO: promising Vietnamese supporting-industry companies | March 2026 | Questions for checking quality systems on site |
| Role of a quality management system | JISC: Quality Management Systems (QMS) | Reference page | Checking the scope of quality-system certification |
| Support for supply-chain diversification | JETRO: overseas supply-chain diversification support programme | 2020–2023 | Considering alternative candidates in that historical programme context |
For shortlisting, see the Cross-Border Sourcing Partner Checklist. For the wider process, see our supply-chain coordination page.
What Terra Vista Co., Ltd. does
Terra Vista Co., Ltd. is a cross-border advisory group working in English, Japanese and Chinese. We coordinate supplier research and local checks. Tasks linked to this table include:
- Organising candidate-factory information and scoring against the table
- Coordinating audit schedules and the points to check on site
- Planning buyer visits to factories and supporting local arrangements
- Interpreting and translating technical exchanges with local staff
Frequently asked questions
What is the Overseas Factory Evaluation Table?
It is a company method used by Terra Vista Co., Ltd. to compare OEM factories on five weighted criteria and apply separate thresholds and conditions to prototypes, small batches and mass production.
Must a factory be excluded if we cannot visit it?
It can remain in a documentary assessment. Missing documents score zero, and the scope and currency of audit evidence must be checked before the method’s mass-production condition is met.
Should a low quoted total take priority?
No. This table scores cost disclosure rather than a low total by itself. A candidate that does not provide a breakdown receives a lower score on this criterion.
Is an on-site audit required at the prototype stage?
This method prioritises documents at the prototype stage and requires audit evidence before moving to mass production. Its stage conditions guide the assessment of the specific project.