Skip to content

Exhibitions & events / Japan / Manufacturing World Fukuoka 2027

Kyushu manufacturing and supply preparation · 8–10 December 2027

Last updated 2026-11-24

Manufacturing World Fukuoka 2027: what does the next batch need?

Making one sample and explaining the next supply batch are different discussions. Quantities, inspection records, timing and contact roles need to be clear. A supply-readiness card helps purchasing and production identify the next question.

Get your free Exhibition Roadmap

When is Manufacturing World Fukuoka 2027? The organiser’s 2027 schedule lists the 5th edition on 8–10 December at Marine Messe Fukuoka, alongside the 2nd Kyushu Semiconductor World. For component, equipment and service suppliers entering Kyushu manufacturing markets, we recommend a Standard Booth, with meetings booked before the show with production, quality and purchasing staff. Confirm 2027 charges and acceptance with the organiser; the free first roadmap includes this show. For how to apply, what the organiser has published, and what your samples need to enter Japan, see How to exhibit at Manufacturing World Fukuoka 2027.

8–10 December 2027Marine Messe Fukuoka
15 / 25Five-factor assessment

Show overview

Show overview

Use Fukuoka to turn a first technical conversation into supply preparation. Choose an existing automotive, robotics or semiconductor-related application and separate information needed for a small batch from ongoing supply. The 2027 date is published in the annual schedule; current website modules still describe 2026, so use edition-specific information for admission, prices and hall allocation.

Dates
8–10 December 2027, 5th edition, from RX Japan’s official 2027 schedule
Venue and organiser
Marine Messe Fukuoka; RX Japan GK. Confirm individual halls in 2027 materials
Concurrent fields
The annual schedule includes the 2nd Kyushu Semiconductor World; manufacturing fields include components, measurement, ODM/EMS and DX
2025 history
8,516 cumulative visits, unique within each day but repeated across days; excludes exhibitor, press and student badges
Roles to prepare for
Design, production engineering, quality and purchasing; identify who confirms quantities, records and timing
Edition checks
Do not use the website’s 2026 dates or forecasts as 2027 plans. Request current full charges and acceptance

Checked 30 October 2026: RX Japan 2027 schedule, page 8, 2025 Fukuoka attendance, current visitor rules, organiser exhibition guide. Keep 2025 results separate from current 2026 modules and recheck 2027 admission and photography rules. Organiser’s website →

Where this stop fits in the year

Where this stop fits in the year

Follow up the change-information work from Manufacturing World Osaka, or start directly with a Kyushu customer task. Select one explainable application and connect first-batch preparation to the information needed when quantities change, carrying a usable supply brief into the next year.

  • Before · Prepare existing uses, quantity ranges, inspection records, lead-time assumptions and contacts; bring the records from Manufacturing World Osaka on 6–8 October if you take part there.
  • This stop · 8–10 December · Connect at a Standard Booth: separate production, quality and purchasing requests for initial and later supply, with meetings booked before the show.
  • Next · Send actual questions to named owners and agree the missing information, quotation assumptions and timing both parties wish to pursue. In our example roadmap this is the last stop of the 2027 year.
2027 · Connect
Role
Connect
Question to answer
What supply information does a buyer need between the first batch and the next?
What to take away
Meeting records and a supply-readiness card: use, quantity range, existing quality records, timing assumptions, contacts, sample and quotation requests, and missing items.
Format and package
A Standard Booth, once 2027 acceptance and full charges are confirmed with the organiser, with meetings booked before the show.
Relay
Respond to actual requests, distinguishing enquiries, sample explanations and quotation discussions, with an owner for each next step.

Five-criterion assessment

Five-criterion assessment

For international component, equipment, processing and manufacturing-service suppliers seeking customers in Kyushu. Each factor is 1–5; higher is more favourable, including easier entry. Terra Vista Co., Ltd. assesses supply preparation and purchasing-information tasks.

Three-Gate Show Selection: define a Kyushu application for an existing product, identify production/quality/purchasing roles, then confirm supply information and 2027 participation conditions. Full current charges require an organiser quotation. Use the stand to answer purchasing questions in person, once the booth proposal and full charges are confirmed.

15/25Overall · What supply information does a buyer need between the first batch and the next?
Buyer fitAutomotive, robotics and semiconductor-related manufacturing can connect design, production and purchasing, with the relevant field selected for each product
Relevant buyer scaleThe 2025 total of 8,516 visits, specialist manufacturing roles and concurrent 2027 semiconductor theme support moderate relevant concentration; attendance is not unique buyers
Return on spendOne application and a supply-readiness card focus information requests, while Japanese materials and continuing replies still require work
Competitive positionRegional suppliers and outside technologies compete; quality records, timing and support conditions need clear explanation
Ease of entryTechnical documents and existing records can be prepared while the application is under way; confirm 2027 admission, samples and display acceptance

Who this stop is for

Who this stop is for

01

Who it suits

Companies with an explainable component, machine, process or manufacturing service and existing quantity, quality and lead-time information.

02

Who to speak with

Production engineering examines use conditions; quality reviews existing records; purchasing discusses quantities, timing and continuing supply. Identify responsible people separately.

03

What to prepare

A Japanese application summary, quantity ranges, existing inspection records, timing assumptions and contacts. Separate public materials from designated business-exchange information.

Before, during and after: nine deliverables

Before, during and after: nine deliverables

One project manager follows the work from planning to review. Nine deliverables connect preparation, on-site records and next-step decisions. The booth and logistics plan covers the stand design and build, the shipping of exhibits and any sample logistics; separate activities are itemised options.

Before

  1. Objectives brief
  2. Booth and logistics plan
  3. Buyer meetings and pre-show pack

On the groundSelect production, quality and purchasing roles by Kyushu application and state a first-batch or continuing-supply question

OnlinePrepare quantity ranges, existing records, timing and contacts in a Japanese supply-readiness card

During

  1. Daily show report
  2. Meeting and lead log
  3. Same-day content

On the groundRecord actual requests and recipients, separating production conditions, quality explanations and quotation assumptions

OnlineUse written and owned, authorised assets, following the current hall photography ban and checking the 2027 version before travel

After

  1. 24-hour lead pack
  2. 7-day update
  3. 30-day review

On the groundIf both parties wish to continue, confirm information, sample explanations or quotation discussions and responsible people

OnlineUse Evidence-Based Readouts to track actual replies and carry the supply-readiness card into the next year’s tasks

Activities around the task

Activities around the task

These are separately priced offsite options, itemising venue, language, participants and material preparation. Existing specifications and records support a discussion document participants can take away.

01

One application, two quantities

Use existing specifications and supply information to compare a small batch with a later quantity. Discuss missing packaging, records and timing information. Participants can observe or contribute and keep a supply-question card. See the approach →

02

Buyer challenge: what must be confirmed first for the next batch?

A participant with a real production or purchasing task raises an information question. Suppliers respond with existing records; retain the question, materials and mutually chosen next step. See the approach →

03

Public use, separate supply conditions

Explain uses and approved assets publicly; discuss quantities, quality records and commercial terms in Invited or Closed sessions. Permissions are separate. Closed sessions are not promoted, photographed, filmed or recorded. See the approach →

Rooted in culture. Useful in context. A reason to meet. Something to gain. Open with purpose. Clear about boundaries. Every event leaves a next step. Start with product facts and uses; name the question in the invitation. Participants may observe or contribute. Share materials within agreed permissions and carry real feedback to the next stop.

Confidentiality throughout

Make the use clear. Set boundaries for commercial detail.

An NDA can be signed before detailed discussion. Public experiences and private meetings are designed as separate sessions. Set each as Open, Invited or Closed, then define access, materials and recording permissions.

  • Internal project files stay with the responsible team and are not reused for other clients; discussion materials go to designated recipients within the agreed scope
  • Current guidance bans ordinary hall photography. Use written and owned, authorised assets and recheck 2027 rules; offsite recording needs permission, with your written approval before publication
  • Closed sessions are not promoted, photographed, filmed or recorded

Packages

Packages

The organiser’s general guide lists 16.2 m² standard and 8.1 m² compact units. Request accepted areas, location and full Fukuoka 2027 charges. Our package areas are reference configurations, not one organiser unit. Booth packages include registration and stand fees; the formal quote itemises actual area, organiser fees, build and services.

Choose by the job: to connect with Kyushu production, quality and purchasing staff, a Standard Booth; to build presence, a Custom Booth or Brand Pavilion. Clarify supply information and the Kyushu purchasing task as the stand is planned.

Standard Booth

Discuss buyer requirements

9 m² and up (reference area)

Included

  • Registration and stand charges included, with their components detailed in the formal quote
  • Branded standard stand, build and on-site support
  • Pre-show invitations and nine deliverables
Ask about this plan

Custom Booth

Get your brand remembered

36 m² and up (reference area)

Included

  • Everything in Standard
  • Custom design, build, display transport and import arrangements
  • Demonstrations and content around the confirmed use
Ask about this plan

Brand Pavilion

Raise your brand’s profile

81 m² and up (reference area)

Included

  • Everything in Custom
  • Brand area and separate discussion space
  • Launch or briefing activity and press invitations
Ask about this plan

Optional separate experiences, technical briefings, buyer meetings, content production and extended follow-up; venue, people and sample requirements are itemised.

Standard Booth, Custom Booth and Brand Pavilion include registration and stand charges. The formal quote itemises organiser charges, build and service components. Prices exclude Japanese consumption tax, travel and sample value. Sample transport and import procedures are options for the Standard Booth. Quotes are free.

For how the cost of this show breaks down and how a stand is quoted, see Cost to Exhibit at a Trade Show and Exhibition Stand Design and Build. Send your floor space and main exhibits and we return a quote in about 5 business days.

2027 · Standard Booth

Preparation and follow-up

These are the planning checkpoints for your stand, counted back from the event. Evidence-Based Readouts record real replies, information requests, quotations and return visits, rather than treating attendance as commercial progress.

CheckpointOur deliveryYour input
T-90Objective brief and meeting roles; organiser quotation and exhibitor contract for the standConfirm application, Kyushu target, budget and stand size
T-60Target list, invitations and information checklistProvide quantity ranges, existing records and lead-time assumptions
T-45Japanese supply-readiness card and question sheetApprove public content and sharing permissions
T-30Stand design proposal, exhibit shipping plan, travel and appointment checksApprove the stand design, confirm participant details and balance payment
T-14Stand layout check and meeting agendas by buyer roleConfirm sample, demonstration or discussion needs
T-7Final itinerary and language rehearsalJoin the rehearsal and confirm contacts
Before openingMove-in and stand build on the days set by the organiserStand team arrives for the final check
Show daysMeetings at the stand, meeting notes and daily reportsStaff the stand and join the meetings
After the last dayMove-out; display items packed and samples sent on the chosen routeConfirm which items go home
T+124-hour lead pack and unanswered questionsConfirm follow-up owners
T+77-day update on materials, quotes and repliesProvide the information agreed
T+3030-day review and next-stop recommendationContinue, adjust or pause
T+90 (extended follow-up)Review actual test, sample and quotation progressReport subsequent developments

Preparation notes

Preparation notes

Dates and entryFollow the official 2027 schedule; do not reuse 2026 registration, halls or prices
Supply and recordsDescribe current quantity ranges, quality records, lead times and contacts
Permissions and photographyCurrent 2026 guidance bans ordinary hall photography; use written and authorised assets and recheck 2027
Samples and follow-upTransport and import procedures are options for the stand; independent offsite discussions have separate quotes

Questions buyers ask

Questions buyers ask

Where are the 2027 Fukuoka dates confirmed?

Page 8 of RX Japan’s official 2027 schedule lists the 5th edition on 8–10 December at Marine Messe Fukuoka. The current homepage’s 2–4 December 2026 dates belong to the preceding edition.

What does 8,516 represent?

Cumulative attendance over three days in 2025, unique within each day and repeated across days, excluding exhibitor, press and student badges. It is not a bookable-buyer total; select discussions by use and role.

Why recommend a Standard Booth?

At a Standard Booth you match existing application, quantity and supply information to production, quality and purchasing questions in person. Once complete 2027 fees and acceptance are confirmed, we fix the stand plan, and a larger stand can follow if the display task grows.

What does the supply discussion leave behind?

A card listing use, quantities, existing records, timing assumptions, recipients and missing information. Continue in response to actual mutual requests. Independent offsite activities are separately priced.

Free first draft

Get your Exhibition Roadmap, including Manufacturing World Fukuoka 2027

To see where Manufacturing World Fukuoka 2027 fits in your year, fill in the form and you receive a first-draft Exhibition Roadmap: the 3 to 5 shows we recommend for the next 12 months, including the Manufacturing World Fukuoka 2027 stop, with the role, timing, format, budget range and reasoning for each. We reply within 2 working days and deliver the draft within 5. The draft is free; no service contract is needed to request it.

Prefer email? Write to info@terravista.co.jp

    Your details are used only to prepare your Exhibition Roadmap.