Skip to content

Trade Shows & Events / Japan / NEPCON JAPAN 2027 Tokyo

Japan · 17–19 February 2027

Last updated 2026-11-24

NEPCON JAPAN 2027 Tokyo

Electronics conversations often begin with one specification. NEPCON Tokyo 2027 adds an EMS and contracted-design focus. Use this stop to connect component, material and process strengths with an application, test conditions and the next engineering review.

Get your free Exhibition Roadmap

How should we approach NEPCON JAPAN Tokyo 2027? It runs on 17–19 February at Tokyo Big Sight. The organiser is accepting exhibitor enquiries and promoting an EMS and contracted-design focus. There is no application deadline and space goes first come, first served, so we recommend applying early for a Standard Booth and booking meetings before the show with the development, quality and purchasing teams of Japanese manufacturers. The formal quotation itemises registration, stand and service components. Prepare Japanese specifications and test evidence before the show. Your first Exhibition Roadmap draft is free and includes this show. For how to apply, what the organiser has published, and what your samples need to enter Japan, see How to exhibit at NEPCON JAPAN 2027.

3days focused on this technical task
3decision roles: technical, quality and purchasing
30days to the post-show review

The show at a glance

Suppliers of electronic components, materials, manufacturing, packaging and inspection equipment, with electronics, semiconductor and automotive-electronics manufacturers.

Dates
17–19 February 2027
Venue
Tokyo Big Sight
Organiser
RX Japan GK
Focus
Suppliers of electronic components, materials, manufacturing, packaging and inspection equipment, with electronics, semiconductor and automotive-electronics manufacturers.

Source: organiser information checked on 30 October 2026 · Organiser show information Organiser’s website →

The task for this stop

Begin with an online application briefing and align the sample with its Japanese specification. Bring the same internally reviewed revision to Tokyo so meeting time goes into the technical question.

For medical-device components, continue at Medtec Japan. For industrial manufacturing applications, consider HANNOVER MESSE. Select the next stop by the customer’s actual industry.

NEPCON JAPAN 2027 Tokyo · Connect
Role
Connect
Question to answer
Give each sample an application card: operating environment, key parameters, interfaces, existing tests and the question to review. Engineering and purchasing should see the same revision.
What you take away
Meeting records with engineering and purchasing contacts, sample and quotation requests, the test conditions discussed, missing evidence, and the next technical review each customer has agreed to.
Format
Standard Booth with working samples; technical meeting invitations sent before the show to development, quality and purchasing staff at Japanese manufacturers, each meeting confirmed by both sides
Next step
Development considers technical fit; manufacturing and quality examine repeatability and records; purchasing considers supply communication and changes. Identify the relevant owner before scheduling the next review.

Our planning assessment

Three-Gate Show Selection considers the application and market conditions, the decision roles at the show, and the stand that suits the task. A Standard Booth is the starting point here, and the readouts from this stop inform the size of your stand at later editions.

16/25Overall · Our preparation assessment for the profile below: 1–5 per criterion, with higher scores more favourable to this task
Buyer fitElectronics manufacturing, testing and EMS topics offer a clear starting point for an application-led discussion
Audience concentrationChoose manufacturing, inspection or design contracting before planning engineering and purchasing conversations
Use of time and budgetAlign revision, test conditions and sample status to reduce repeated explanation
Competitive positionPrecision or capacity alone is easy to match; differentiation needs test conditions and records
Ease of entryExhibitor recruitment is open; review the application, Japanese materials and participation format first

Who this stop fits

01

A useful fit

Component, material and inspection-equipment suppliers, EMS businesses and design/manufacturing partners. Start with one application or process task before expanding the product range.

02

The discussion task

Give each sample an application card: operating environment, key parameters, interfaces, existing tests and the question to review. Engineering and purchasing should see the same revision.

03

Evidence for the next review

Specification revisions, test conditions, approved results, sample status and supply stage. Present the claimed performance alongside the conditions under which it was measured.

Before, during and after: nine deliverables

Terra Vista Co., Ltd. is a Japan-based cross-border advisory group. One project manager carries the plan through to follow-up. Our four project standards guide the presentation, participation and information boundaries. We organise technical material around the recipient’s decision process and leave each meeting with a task someone can take forward.

Rooted in culture. Useful in context. A reason to meet. Something to gain. Open with purpose. Clear about boundaries. Every event leaves a next step.

Before

  1. Objectives brief
  2. Booth and logistics plan
  3. Buyer meetings and pre-show pack

On the groundSpecification revisions, test conditions, approved results, sample status and supply stage. Present the claimed performance alongside the conditions under which it was measured.

OnlineKeep missing parameters, usage permissions and follow-up owners with the same document revision

During

  1. Daily show report
  2. Meeting and lead log
  3. Same-day content

On the groundDevelopment considers technical fit; manufacturing and quality examine repeatability and records; purchasing considers supply communication and changes. Identify the relevant owner before scheduling the next review.

OnlineKeep missing parameters, usage permissions and follow-up owners with the same document revision

After

  1. 24-hour lead pack
  2. 7-day update
  3. 30-day review

On the groundEvidence-Based Readouts record accepted material, specific questions, responsible roles and the next review. Each record identifies an action and owner so follow-up can continue.

OnlineKeep missing parameters, usage permissions and follow-up owners with the same document revision

Make technical meetings worth attending

Build on this technical task with technical seminars and briefings, buyer meetings or a shared working session. These are separate options, with venue, people and materials itemised in the quotation.

01

One product, two contexts

“One product, two contexts” compares a component in its existing and intended applications: temperature, space, interfaces and reliability questions. Separate directly comparable evidence from the tests the new use calls for.

02

A brief from the buyer

“A brief from the buyer” brings a design or procurement task to the table, alongside samples, parameters and validation questions. Participants leave with information to exchange and a defined review agenda.

03

Make something useful together

“Make something useful together” uses a one-page interface drawing to connect the component, board, equipment and process. Each participant marks their input conditions for colleagues to review later.

Clear access, dependable boundaries

Keep technical discussions within the agreed scope

Separate public sample introductions from restricted technical packs. Release drawings, raw test data and customer project names within the agreed access scope, and agree the use of sample photography. Share internal project files with authorised team members. For material exchanged between companies, agree separately on access, recipients and permitted use before the discussion.

  • Development considers technical fit; manufacturing and quality examine repeatability and records; purchasing considers supply communication and changes. Identify the relevant owner before scheduling the next review.
  • Agree whether each session is public, invitation-only or closed. A closed session has no public promotion, photography, audio recording or video recording.

Packages

A Standard Booth is recommended for this stop. There is no application deadline and locations are chosen from the open spaces in order of application, so an early application gives the widest choice. The formal quotation itemises the included registration, stand, build and service components.

Choose by the job: to connect with Japanese engineering and purchasing teams, a Standard Booth; to build presence, a Custom Booth or Brand Pavilion.

Standard Booth

Discuss buyer requirements

9 m² (plan reference)

Included

  • Registration and stand charges included, with their components detailed in the formal quote
  • Branded standard stand, build and on-site support
  • Pre-show invitations and nine deliverables
Ask about this plan

Custom Booth

Get your brand remembered

36 m² and up (plan reference)

Included

  • Everything in Standard
  • Custom design, build, display transport and import arrangements
  • Demonstrations and content around the confirmed use
Ask about this plan

Brand Pavilion

Raise your brand’s profile

81 m² and up (plan reference)

Included

  • Everything in Custom
  • Brand area and separate discussion space
  • Launch or briefing activity and press invitations
Ask about this plan

Optional separate experiences, technical briefings, buyer meetings, content production and extended follow-up; venue, people and sample requirements are itemised.

Standard Booth, Custom Booth and Brand Pavilion include registration and stand charges, itemised alongside build and service components in the formal quotation. Prices exclude Japanese consumption tax, travel and sample value. Sample transport and import procedures are options for the Standard Booth. Your products, task and travelling team shape the plan. Quotes are free.

For how the cost of this show breaks down and how a stand is quoted, see Cost to Exhibit at a Trade Show and Exhibition Stand Design and Build. Send your floor space and main exhibits and we return a quote in about 5 business days.

Your exhibitor timeline

Evidence-Based Readouts record accepted material, specific questions, responsible roles and the next review. Each record identifies an action and owner so follow-up can continue.

MilestoneWe deliverYou provide
Contract and stand locationAs early as you decide: there is no deadline, and locations go in order of applicationSigned exhibitor contract
T-90Objectives brief and target applicationProducts and objective
T-60Technical evidence review; stand design and power load finalisedExisting specifications and test records; the units you will run and their power draw
T-45Target roles and contact listRoles you want to approach
T-30Booth and logistics plan: stand build, and the customs and return route for each demo unit, fixed before freight is bookedMaterials, demo units and travel plan
T-14Buyer meetings and pre-show pack; invited customers reminded to register free by 14 FebruaryAvailability and participants
T-7Align document revisions and rehearse discussionsJoin the online rehearsal
Move-in, usually one or two days before openingStand set-up; demo units installed and tested under powerYour engineers install and test the units
17–19 February 2027Daily show report, meeting and lead log, same-day contentStaff the stand and join the technical meetings
After move-outDemo units packed and shipped on the chosen customs routeConfirm which units go home
T+124-hour lead packConfirm follow-up priorities
T+77-day update on information exchange and follow-up questionsSupply requested material
T+3030-day review: next actions and ownersDecide the next stage
T+90Extended follow-up: next review and show proposalShare internal review progress

Before you travel

Sample revisionMark sample identifiers, specification revisions and test conditions for internal circulation
Technical materialPut the application, parameters and review task first in Japanese; provide detailed records by access level
Supply communicationPrepare contacts, sample readiness and change communication, then record the questions raised
StandApply early, since space goes first come, first served; the organiser’s floor plan and quotation set the stand layout and budget

Common questions

Is this the Tokyo edition or the autumn edition?

This page covers 17–19 February 2027 at Tokyo Big Sight. The autumn edition has separate dates and a different venue; our materials, route and budget here relate to Tokyo.

Is it relevant to EMS and contracted-design businesses?

The organiser is promoting these areas for the 2027 Tokyo edition. Define the application, scope you can undertake and existing evidence before choosing the decision roles to approach.

Should engineering and purchasing receive the same material?

They need the same factual revision, with different reading paths. The technical pack retains conditions and records; the meeting brief identifies supply stage, contacts and the next review task.

How do quotations connect to technical discussions?

Record the application, specification and missing data first, then progress quotation conditions and internal review. Confirmed receipt of material, a technical owner or a follow-up meeting enters the Evidence-Based Readouts.

Free first draft

Get your free Exhibition Roadmap

Tell us your product, application and preparation stage. Receive a free first-draft Exhibition Roadmap with 3–5 suggested shows over the next 12 months, including NEPCON JAPAN 2027 Tokyo: each stop’s role, timing, format, budget range and reasoning. We reply within 2 working days and deliver the draft within 5. No service contract is needed to request it.

Prefer email? Write to info@terravista.co.jp

    Your details are used to plan your Exhibition Roadmap. Undecided items can be discussed together.