T+30 Follow-up Worksheet is Terra Vista Co., Ltd.’s company method for planning post-show follow-up: which contact to approach, what to send and what next step to discuss on days 1, 3, 7, 14 and 30 after an overseas trade show.
It is for overseas-business and sales teams deciding how to follow up after collecting business cards. It complements the pre-show T-90 Preparation Worksheet in the 2026 overseas trade-show guide. To apply it to your contacts, use our contact form.
- This method assigns A, B or C from the other party’s expressed interest and any mutually confirmed next step, rather than job title or company size.
- Each planned contact has one recipient, one new item of useful information and one proposed next step. Skip a contact when there is no new material; follow the recipient’s stated wishes and agreed communication arrangements.
- Adjust the dates to the individual company’s decision process and local calendar.
- On day 30, record whether to continue, pause or close. A clear decision to close is also a useful outcome of the review.
Why use the T+30 worksheet?
A thank-you message and a priority label do not determine what belongs in the second message. This worksheet maps recipients, dates and materials through day 30, so each planned contact has a concrete purpose beyond asking for an update.
How should we follow up on contacts from an overseas trade show?
Classify contacts after the final day, then plan the relevant contacts on days 1, 3, 7, 14 and 30. Day 1 is the day after the show closes. Use new material to discuss a next step, and record continue, pause or close on day 30. These are planning points in our method.
| Day | Recipient group | One new item to send | Next step to discuss |
|---|---|---|---|
| Day 1: the day after closing, within the original 48-hour planning window | A and B | A thank-you referring to the specific conversation, with the material agreed there, in the recipient’s language | For A, propose two meeting times; for B, confirm when the question will be answered |
| Day 3 | A | A quotation, or a sample-dispatch update with the expected arrival date | A date to discuss the material or sample after arrival |
| Day 3 | C | Where material-sharing was agreed, one message pointing to the material; then close that contact sequence | Do not seek a commitment; reassess as B if the reply raises a concrete question or interest |
| Day 7 | A and B | Material answering a question: an available test-report copy, a use-case video, or an MOQ and lead-time table | For A, agree an online meeting date; for B, identify the decision-maker |
| Day 14 | A and B, including B contacts not yet moved to A | One page for internal discussion: comparison, adoption steps or commercial terms | Propose a meeting involving the decision-maker |
| Day 30 | A and B | A summary of actual agreements and the proposed follow-up status | Continue: confirm the next date. Pause: seek agreement on a restart month. Close: send thanks and end the sequence |
Prepare draft materials and internal owners before opening. The day-30 review is a midpoint in the eight-week follow-up described in overseas trade-show preparation and on-site operations.
How should collected business cards be prioritised?
Use actual interest and confirmed next steps: A has a mutually agreed, dated next step; B has a concrete question but no agreed next step; C was an exchange of cards or greetings only. Record title and company size, but assign them zero points in this method.
| Group | What actually happened | Planned contact opportunities |
|---|---|---|
| A | Both parties agreed a date for a quotation, sample, meeting or company visit | Five: days 1, 3, 7, 14 and 30 |
| B | Concrete questions on use, pricing or certification, but no agreed next step | Four: days 1, 7, 14 and 30 |
| C | Cards and greetings only, including information-gathering or someone making a sales pitch | One on day 3, where material-sharing was agreed |
| Record only | Title, company size and proximity to the decision-maker | Zero points |
Why a senior title does not automatically mean A
A title describes the person’s role, not interest in your product. A company owner who only exchanged greetings is C; a staff member with a mutually agreed quotation date is A. Focus limited follow-up time on A and B.
How long should we follow up without a reply?
This method reviews the sequence on day 30. Rather than send repeated reminders to an unresponsive A contact, consider useful internal-discussion material on day 14. On day 30, decide whether to continue, pause or close. Record a restart month as agreed only if the other party has actually agreed.
| Situation | Decision | Next action |
|---|---|---|
| No new material to send | Skip that contact | Prepare one useful item before the next relevant contact |
| A has not replied by day 14 | Change the material rather than send a reminder | Send one page for internal discussion in the recipient’s language, under the agreed communication arrangements |
| C replies with a concrete question or interest | Reclassify as B | Join the day-7 stage, adjusting to the actual date |
| No next date by day 30 | Pause or close | For a pause, seek agreement on a restart month; otherwise record it as unconfirmed. Close with thanks |
How should follow-up differ across the United States, China and Southeast Asia?
Keep the planning points, but confirm the recipient’s channels, decision-makers and timing. The table below gives questions and options to test with each company; it is not a statistical description of all businesses in a market.
| Planning question | United States | China | Southeast Asia |
|---|---|---|---|
| Response expectations | How and when will they indicate whether they want to proceed? | Do they use chat for same-day operational questions? | Which points can be settled remotely, and which need a meeting? |
| Decision-maker | What can the buyer decide independently? | Does the owner need to be involved? | What roles do the owner and local agent play? |
| Communication channel | Confirm the use of email and online meetings | Confirm whether WeChat is appropriate and where formal documents should go | Confirm the chat app and email arrangements for that country and company |
| Material to consider | A one-page summary of price terms, lead times and certification | Samples and authorised production-site video | Local use cases and a proposed return visit |
| Date adjustments | If appropriate, front-load days 1 and 3 and propose a meeting by day 7 | If agreed, connect by chat on day 1 and arrange sample dispatch by day 3 | Where face-to-face discussion matters, use days 14 and 30 to plan a visit or the next show |
Check holidays too. If a local holiday falls within the 30-day plan, discuss the next step beforehand and use the third working day after the holiday as a proposed restart point in this method. Confirm it with the recipient. Official calendars are linked below.
Apply the worksheet in six steps
- Before opening, draft the materials for the planned contacts and assign internal owners.
- During the show, record each contact’s actual interest, agreed next step and date, and connection to the decision-maker.
- On the final evening, classify A, B and C and organise contacts by market.
- Adjust the planned dates to the recipient’s decision process and local calendar.
- Each contact uses one recipient, one new useful item and one proposed next step; skip contacts without new material.
- On day 30, record continue, pause or close and carry the record into the week-eight written review.
Fictional example: a commercial noodle-machine maker at a Southeast Asian food-machinery show
The company, people and figures are all fictional. Of 80 cards classified on the final evening, nine were A, 23 B and 48 C. Three illustrative follow-up paths are shown below.
| Contact | What happened at the show | Group | Days 1–14 | Day-30 status |
|---|---|---|---|---|
| X: buyer at a U.S. importer | Asked about price terms; both parties agreed on a quotation and its date | A | Send a quotation and terms sheet on day 3; agree an online meeting date on day 7 | Continue: discuss trial-order terms |
| Y: general manager of a Chinese agency | Exchanged cards and greetings only | C | One day-3 message pointing to material, if sharing was agreed | Close the sequence; reassess as B if a concrete question or interest arrives |
| Z: staff member at a Thai distributor | Asked about noodle texture; no next step agreed | B | Day 7: a video using local flour. Day 14: propose a meeting with the owner | Pause: both parties agree to resume at next month’s visit |
Y has the most senior title but remains C; X is A. In this fictional example, Z favours an in-person discussion and uses day 30 to agree the visit.
General follow-up and the T+30 worksheet
| Aspect | General approach | T+30 worksheet |
|---|---|---|
| Classification | Title, company size and perceived interest | Actual interest and mutually confirmed next steps |
| From the second message | Ask for an update | One new useful item and one proposed next step |
| Timing | The same in every market | Adjust to the recipient’s decision process and calendar |
| Closing the sequence | When replies stop | Record continue, pause or close on day 30 |
A lighter approach may be sufficient when there are few contacts and each had an in-depth discussion at the show.
Public resources and calendars for post-show planning
| Resource | Description | Use in T+30 |
|---|---|---|
| JETRO overseas trade fairs and exhibitions | Japan Pavilion support with an open application process | Discuss a future show with contacts marked “continue” on day 30 |
| JETRO trade and investment consultations | Free advisory consultations on practical export and overseas-expansion questions | Clarify trade terms or procedures raised in quotation discussions |
| SMRJ hands-on overseas-expansion support | Free consultations with experienced specialists, including online consultations | Review the market and sales approach when many contacts are paused or closed |
| JETRO e-Venue | An international business-matching site with free registration, browsing and contact | Explore enquiries from the same market outside the exhibition |
| U.S. Office of Personnel Management federal holidays | Thanksgiving in 2026 falls on 26 November | Discuss earlier timing for contacts falling between Thanksgiving and year-end |
| China’s State Council General Office notice on 2026 holidays | The 2026 Spring Festival break is 15–23 February; National Day is 1–7 October | Discuss the next step before the holiday |
| Singapore Ministry of Manpower public holidays | Public-holiday dates by year | Check each Southeast Asian country’s calendar separately |
Terra Vista Co., Ltd.’s role
Terra Vista Co., Ltd. is a cross-border advisory group based in Japan. We plan trade-show strategy, workshops and international business-exchange programmes, coordinate on-site operations, and prepare content in Chinese, Japanese and English within the agreed project scope.Our trade-show and workshop services use the T+30 worksheet for four tasks.
- Before opening, prepare a worksheet naming internal owners and draft materials for the planned contacts
- Prepare a contact-record format for actual interest and agreed next steps during the show
- Draft messages in the recipient’s language and edit authorised on-site photos and video
- Review the day-30 status and prepare the week-eight written review
For choosing exhibitions across the year, see trade-show strategy and annual participation planning.
Post-show follow-up is part of the participation roadmap. Arrange the year’s shows by timing and market, with three deliverables each before, during and after the show.
Frequently asked questions
What is the T+30 Follow-up Worksheet?
It is Terra Vista Co., Ltd.’s post-show planning method. Contacts are classified A/B/C from actual interest and confirmed next steps, with materials and proposed actions planned for days 1, 3, 7, 14 and 30 after closing.
When should the thank-you message be sent?
This worksheet uses day 1, the day after closing, within the original 48-hour planning window. Refer to the actual conversation in the recipient’s language and attach the agreed material.
How are A, B and C assigned?
A has a mutually agreed, dated next step; B has a concrete question but no agreed next step; C only exchanged cards or greetings. Titles and company size are recorded but score zero in this method.
How many times should we contact someone who has not replied?
The worksheet allows up to five planned contacts for A, four for B and one agreed material-sharing message for C. Contact only when there is useful new material, follow stated preferences, and record continue, pause or close on day 30.
How do T-90 and T+30 work together?
T-90 covers preparation from 90 days before opening; T+30 structures the first 30 days after closing. Prepare the T+30 materials and internal owners during T-90 planning.
To apply the worksheet to your contacts, use our contact form.
Talk to our team
Get a tailored answer on sourcing, market entry or compliance — free consultation, three languages.