Exhibitions & events / Japan / Interop Tokyo 2027
Interoperability and operating evidence · 9–11 June 2027
Last updated 2026-11-24
Interop Tokyo 2027: make connection evidence useful to the people who run it
A connection is only the start. A technical customer needs to understand the versions, load and operating conditions behind it. Turn a feature presentation into a conditions sheet that network, data-centre and enterprise roles can use to identify the next evidence they need.
Get your free Exhibition RoadmapWhen is Interop Tokyo 2027, and how should a technology supplier take part? It runs 9–11 June at Makuhari Messe, 10:00–18:00, closing at 17:00 on the last day. Network, cloud and data-centre suppliers entering Japan can take a Standard Booth to run live demonstrations and answer integrators and carriers on interoperability, operation and handover questions. Bring versioned evidence with a clear environment and test scope, and record actual questions and recipients. The free first exhibition roadmap includes this show. For how to apply, what the organiser has published, and what your samples need to enter Japan, see How to exhibit at Interop Tokyo 2027.
Show overview
Show overview
Interop combines exhibitions, technical discussion and ShowNet, an onsite network project built by exhibitors who bring their products and services, together with volunteer engineers. Use it as a starting point for understanding interoperability and operation questions. The official 2027 prospectus confirms 9–11 June, Makuhari Halls 3–8 and the conference hall. Its approximately 150,000 visitors is a forecast including concurrent events. The 2026 homepage records 143,312 visits including concurrent events, not this company’s available buyers.
- Dates
- 9–11 June 2027; 10:00–18:00, final day until 17:00
- Venue
- Makuhari Messe: International Exhibition Halls 3–8 and International Conference Hall
- Organiser and operators
- Interop Tokyo Executive Committee; operated by Nano Opt Media and the Internet Association Japan
- Historical scale
- 2026 official homepage: 143,312 visits including concurrent events, not a 2027 actual or available-buyer count
- Current forecast
- 2027 prospectus: approximately 150,000 visitors including concurrent events; separate from historical results
- Role background
- The prospectus labels the industry profile as 2025 actuals: user companies 39%, integrators and related trading businesses 23%
Official operator 2027 prospectus, exhibitor recruitment page, 2026 visitor totals and ShowNet introduction, checked 23 November 2026. Industry percentages are labelled 2025 actuals; 150,000 is a 2027 forecast. Confirm ShowNet rights under the organiser’s terms. Organiser’s website →
Where this stop fits in the year
Where this stop fits in the year
Prepare a connection-conditions sheet: product or service version, peer technology, environment, load, tested scope and open questions. Use the same sheet at your stand and in meetings to record requested test explanations, operating documents and follow-up recipients.
- Before the show · Use the Japan exhibition calendar to select applications and roles. Complete the version and operating-condition details in your materials.
- This stop · 9–11 June 2027 · Connect: a Standard Booth with live demonstrations, taking interoperability, operating and handover questions from integrators and carriers.
- Next step · Choose a technical briefing or buyer meeting from actual requests, with open conditions assigned to a named document recipient.
- Question to answer
- Which versions, environment and load matter to this customer, and what interoperability or operating evidence is needed next?
- What to bring back
- Real connection and operation questions, missing documents, application conditions, recipients and follow-up tasks both sides agree to pursue.
- Format and tier
- A Standard Booth running live demonstrations, with independent technical meetings booked before the show. Confirm display, ShowNet and official-speaking rights separately under organiser terms.
- Relay
- Turn technical questions into specific document tasks. Watching a connection demonstration is not a compatibility certification or purchase decision.
Five-criterion assessment
Five-criterion assessment
For network, cloud and data-centre technology suppliers entering Japan. Each dimension scores 1–5; higher is more favourable, including easier entry. Terra Vista Co., Ltd. assesses the technical-evidence and role-selection task described here.
Three-Gate Show Selection: define the network application, identify user, carrier, data-centre and integration roles, then choose participation using evidence, permissions and budget.
Who this stop is for
Who this stop is for
Who it suits
Network, cloud, data-centre and enterprise-technology suppliers explaining interoperability and operating evidence to Japanese customers.
Who to meet
Enterprise technical teams, network operators, data-centre and integration roles. Establish the environment and decision each person is responsible for.
What to bring
A Japanese technical summary, versions and environments, test scope and results, deployment and operating documents, supply and support information, using approved customer-network examples.
Before, during and after: nine deliverables
Before, during and after: nine deliverables
One project manager follows the work from planning to review. Nine deliverables connect preparation, on-site records and next-step decisions. For a Standard Booth, the booth and logistics plan covers stand design and build and selected sample logistics; separate activities are itemised options.
Before
- Objectives brief
- Booth and logistics plan
- Buyer meetings and pre-show pack
On the groundSelect roles by network application and operating responsibility, with specific questions and invitation context
OnlineMake versions, peer connections, tested scope and operating environment readable as a standalone brief
During
- Daily show report
- Meeting and lead log
- Same-day content
On the groundRecord actual technical questions, missing materials, receiving roles and the next step agreed by both sides
OnlinePresent approved topologies and conditions, distinguishing tested results from scenarios still to evaluate
After
- 24-hour lead pack
- 7-day update
- 30-day review
On the groundSend operating or interoperability documents actually requested and record replies and subsequent evaluation tasks
OnlineUse Evidence-Based Readouts to separate viewing, technical questions, document requests, evaluation tasks and actual responses
Activities around the task
Activities around the task
These optional technical-communication formats are itemised by venue, language support, materials and production. Clarify operating questions and leave a conditions sheet, a document checklist and the next recipient.
One connection, two operating conditions
Compare versions, load or environment using existing approved material, then identify what information is still needed to judge fit.Technical briefing →
Explain the topology to the next colleague
Have different roles read one approved topology and capture what technical, operations and purchasing colleagues each need in the handover.Product experience →
Let each technical question leave with a recipient
Group actual questions into documents to supply, conditions to check and discussions to arrange, recording the requester and agreed recipient.Buyer meetings →
Rooted in culture. Useful in context. A reason to meet. Something to gain. Open with purpose. Clear about boundaries. Every event leaves a next step. Start with product facts and uses; name the question in the invitation. Participants may observe or contribute. Share materials within agreed permissions and carry real feedback to the next stop.
Confidentiality throughout
Specific technical discussion, controlled system information
An NDA can precede detailed discussion. Design public experiences and private meetings separately, selecting Open, Invited or Closed for each session and defining participants, demonstration data and exchange materials.
- Internal project files remain with the responsible team and are not reused for other clients; designated exchange materials go to designated recipients within the agreed scope
- Use sample or authorised data and screens; filming needs organiser, venue and participant permission, and public content also needs your written approval
- Closed sessions are not promoted, photographed, filmed or recorded
Packages
Packages
Start with a Standard Booth and size later display investment from the technical questions you actually receive. Booth tier sizes are reference configurations for our plans. The organiser has not published its space fee, so we obtain it from the organiser’s sales desk, which also confirms whether space can still be found, and the quote itemises organiser charges, construction and services. Confirm area, connectivity and display conditions for this edition. ShowNet, official talks and awards have separate organiser terms; independent activities itemise venue, language support, materials and production.
Choose by the job: to connect with integrators and carriers, a Standard Booth; to build presence, a Custom Booth or Brand Pavilion.
Standard Booth
Discuss buyer requirements
9 m² plan reference
Included
- Registration and stand charges included, with their components detailed in the formal quote
- Branded standard stand, build and on-site support
- Pre-show invitations and nine deliverables
Custom Booth
Get your brand remembered
From 36 m², plan reference
Included
- Everything in Standard
- Custom design, build, display transport and import arrangements
- Demonstrations and content around the confirmed use
Brand Pavilion
Raise your brand’s profile
From 81 m², plan reference
Included
- Everything in Custom
- Brand area and separate discussion space
- Launch or briefing activity and press invitations
Optional separate experiences, technical briefings, buyer meetings, content production and extended follow-up; venue, people and sample requirements are itemised.
Standard Booth, Custom Booth and Brand Pavilion sizes are reference configurations for our plans. The organiser has not published its space fee, so it is requested from the organiser’s sales desk, and the formal quote itemises organiser charges, build and service components. The quote excludes travel and sample value. Sample transport and import procedures are options for the Standard Booth. Quotes are free.
For how the cost of this show breaks down and how a stand is quoted, see Cost to Exhibit at a Trade Show and Exhibition Stand Design and Build. Send your floor space and main exhibits and we return a quote in about 5 business days.
2027 · Standard Booth
Preparation and follow-up
These are your exhibitor checkpoints counted back from the event. Evidence-Based Readouts record real replies, information requests, quotations and return visits, rather than treating attendance as commercial progress.
| Checkpoint | Our delivery | Your input |
|---|---|---|
| On signing | Application and stand location request through the organiser’s sales desk, which confirms whether space can still be found | Company details and exhibit list |
| T-90 | Objective brief and meeting roles | Confirm product, market and budget |
| T-60 | Target list, invitations and information checklist | Provide specifications, credentials and price range |
| T-45 | Japanese materials and question sheet | Approve public content and sharing permissions |
| T-30 | Final stand design, registration, travel and appointment checks | Confirm participant details and balance payment |
| T-14 | Stand build preparation, sample and demo-unit route, and meeting agendas | Confirm sample, demonstration or discussion needs |
| T-7 | Final itinerary and language rehearsal | Join the rehearsal and confirm contacts |
| Move-in, before opening | Stand set-up; samples or demo units installed | Staff on site for set-up |
| Show days | Stand staffed, separate meeting notes and daily reports | Staff the stand and join the confirmed meetings |
| After move-out | Samples and demo units packed and shipped on the chosen route | Confirm which items go home |
| T+1 | 24-hour lead pack and unanswered questions | Confirm follow-up owners |
| T+7 | 7-day update on materials, quotes and replies | Provide the information agreed |
| T+30 | 30-day review and next-stop recommendation | Continue, adjust or pause |
| T+90 (extended follow-up) | Review actual test, sample and quotation progress | Report subsequent developments |
Preparation notes
Preparation notes
Questions buyers ask
Questions buyers ask
When and where is Interop Tokyo 2027?
The official 2027 prospectus lists 9–11 June at Makuhari Messe Halls 3–8 and the International Conference Hall; 10:00–18:00, closing at 17:00 on the final day.
How can ShowNet inform preparation?
Understand the organiser’s network project and use it to prepare your interoperability and operation questions. Participation, contributions and associated rights follow the edition’s organiser terms. Independent technical discussions use existing evidence and actual questions.
How do historical and forecast counts differ?
The 2026 homepage records 143,312 visits including concurrent events. The 2027 prospectus forecasts about 150,000, also including concurrent events. Its industry profile is labelled 2025 actuals. None is an available-buyer count for your company.
What should the stand leave behind?
A connection-conditions sheet, real technical questions, missing documents and the next recipient. When both sides want to continue, arrange an independent briefing or meeting and record replies and subsequent tasks.
Compare more shows
Also worth comparing
Same sector
Same region
Funding and preparation
- Exhibition Stand Design and BuildWhat drives the cost
- Cost to Exhibit at a Trade ShowBudget breakdown
- Exhibit Shipping and CustomsFreight, ATA Carnet, who does what
- Trade Show Staff and InterpretersMatched to your buyers' languages
- Pre-Show Buyer MeetingsOutreach from 90 days before opening
- Japan Exhibition Grants 2026Dates and how to exhibit
- International Trade Show Support
Free first draft
Get your Exhibition Roadmap, including Interop Tokyo 2027
To see where Interop Tokyo 2027 fits in your year, fill in the form and you receive a first-draft Exhibition Roadmap: the 3 to 5 shows we recommend for the next 12 months, including the Interop Tokyo 2027 stop, with the role, timing, format, budget range and reasoning for each. We reply within 2 working days and deliver the draft within 5. The draft is free; no service contract is needed to request it.
Prefer email? Write to info@terravista.co.jp
Your details are used only to prepare your Exhibition Roadmap.